Sections

Weather Forecast

Close
Advertisement
About 4 a.m. Monday, one of the few remaining portions of the old Highway 61 bridge was dropped into the Mississippi River. (RiverTown Multimedia photo by Chad Richardson)

All lanes of new Highway 61 bridge to open

Email Sign up for Breaking News Alerts
News Cottage Grove,Minnesota 55016 http://www.swcbulletin.com/sites/default/files/styles/square_300/public/field/image/112013.N.SWC_.Bridge.jpg?itok=lS7b9vCY
SWC Bulletin
651-459-9491 customer support
All lanes of new Highway 61 bridge to open
Cottage Grove Minnesota 7584 80th Street South 55016

Years and years of frustrations, backed-up traffic, terrible crashes, construction delays, construction marvels and gawking are about to be over.

Advertisement
Advertisement

Saturday afternoon, it is expected that the new U.S. Highway 61 bridge over the Mississippi River in Hastings will be fully opened. Two lanes in each direction will zip over the bridge with hardly any construction orange in sight.

Doyle Honstad, the project manager with Lunda Construction, said he expects all four lanes of the $130 million bridge about 20 miles southeast of St. Paul to open in full Saturday.

“It’s been pretty smooth,” Honstad said. “The weather has cooperated. Things have been moving right along.”

While delays hit the project hard at the beginning, things haven’t been nearly as rocky lately. The delays were no fault of the contractors – the project was slowed initially by high water and then by a state government shutdown.

“There’s a real sense of accomplishment and pride in the skilled workers that have had such a commitment for three years,” Honstad said.

Dumped into the river

About 4 a.m. Monday, one of the few remaining portions of the old Highway 61 bridge was dropped into the Mississippi River.

The event was captured on video by Hastings photographer Dave Youngren, who had gotten up at 1:30 a.m. to make sure he was on the scene to capture it.

Just before 4 a.m., he saw the bridge get knocked over and a few people who were watching at the time began to cheer.

“Do it again,” one person hollered.

The final section would be cut up and floated away by barge as previous sections had been.

‘Bridging the future’

The men and women who did the work in Hastings are embarking on a campaign to thank Hastings for the work.

Representatives of the Minnesota Laborers Union, other union trades and contractors are preparing to say “Thanks” for their “interest, patience and trust in letting them be an integral part of this historic project,” according to a press release issued by the Minnesota Laborers – Employers Cooperation and Education Trust. Ads are scheduled to be published in area publications and a month-long digital billboard ad has been taken out, too.

“Hundreds of Union construction workers, spanning eight different trades, had a hand in building this beautiful bridge, which links Hastings and other communities to St. Paul,” said Gary Reed, Laborers Union Local 132 Business Manager. “It’s a time to celebrate this achievement and thank all the people of Hastings for helping to see this process through.

“There was a lot of sacrifice associated with this project. Not only did the Union workers spend over 500,000 hours working on the structure-including some nights and weekends, when they could be with their families- we know the people of Hastings were inconvenienced somewhat too through the construction process. With modern technology, patience and hard work, we made it happen and this project is symbolic of what kind of good things happen when everyone works together.  It is amazing that with modern technology and proper maintenance that this new bridge is intended to last 100 years.”

Dedication

The new bridge will be officially dedicated at an event at 10 a.m. Nov. 22, at City Hall. The event will take place in the city council chambers.

Advertisement
Chad Richardson
Chad Richardson is the publisher and editor at the Hastings Star Gazette. He was the general manager of the Farmington Independent and Rosemount Town Pages from 2000 to 2007. He previously worked at the Star Gazette from 1996 to 2000 as a photographer and reporter. He also worked as a photographer and writer at the Pope County Tribune in Glenwood.
(651) 319-4500
Advertisement
Advertisement
randomness